Dudley HS Traffic Improvements

This 21 day project included the following:

 

  • Removal of existing sidewalk, partial removal of masonry planters, and removal of a tree and multiple bushes
  • Paved new bus lane
  • Poured new sidewalk
  • Repaired Masonry Planters

About Project:

Page HS Interior Courtyard Access Door & Ramp

Installed all site concrete to include the following:

 

  • Remove selected sections of existing aluminum windows, glazing, and masonry
  • Modify existing window frame and install a new aluminum exit door, storefront framing, and glazing.
  • new concrete ramp with steel guard rails and hand rails
  • new exterior door

About Project:

Town of Gibsonville

About Project:

  • Installed curb and gutter
  • Sidewalks
  • Segmental wall
  • Asphalt paving
  • Drainage structures and RCP

Grimsley HS New Cafeteria & Site Improvements Project

About Project:

Installed all site concrete to include the following:

 

  • Install new ADA Concrete ramps through campus
  • New over 20000sf of concrete sidewalks
  • Dumpster pads
  • Concrete steps
  • Concrete courtyard with cst in place drainage trench

Contact Information

415 Pisgah Church Rd.

PMB 128

Greensboro, NC 27455

Bus: (336) 272-7722

Fax: (336) 272-7723

Email: info@asjwilsonconstruction.com

© 2015. ASJ WILSON CONSTRUCTION, LLC.  All Rights Reserved.